Skip to content

Product · Simulate

See the savings before you commit

Because RiDERgy models your site and has the data, it can show what would change before anything is switched on. Your fleet, your fuses and real prices, replayed.

How the simulation works

From your site to a number you can check

  1. 01

    Model your site

    Grid connection, main switch, sub-distributions, strands and every charge point, with the rating of each fuse. Building load, solar and storage sit where they actually connect.

  2. 02

    Add fleet and shifts

    Vehicles, typical arrival and departure times and how much charge each one needs, so the plan knows when a vehicle has to be ready.

  3. 03

    Replay on real prices

    Your site is replayed on real day-ahead prices. The RiDERgy plan and plain load management run on the same day, so the comparison is fair.

  4. 04

    Agree the roadmap

    Together we set priorities and milestones, and what a set-up looks like for your site.

What you get

The same day, planned two ways

For every day we replay you see the highest draw at your connection, the cost per kWh and how many vehicles were short at departure, for plain load management and for the RiDERgy plan side by side. On the example depot on the product page the plan holds the connection lower, charges at a lower cost per kWh and leaves fewer vehicles short.

Measure Dynamic load management Dynamic with a 150 kW peak cap RiDERgy plan
Highest draw at the connection 277 kW 150 kW 150 kW
Average charging cost 30.1 ct/kWh 27.9 ct/kWh 24.0 ct/kWh
Vehicles short of their target 4 6 1

Example depot with invented fleet, buildings and fuses and real EPEX day-ahead prices. One example day, not a forecast for your site.

What we need from you

A few facts about your site

  • Fleet list and typical shift times
  • Charger models and who runs your charge point management system
  • Grid connection size and electricity contract
  • Single-line diagram or the fuse list from your electrician
  • For solar: panel size, inclination and orientation

Questions about the simulation

Do I have to commit before I see numbers?

No. The simulation comes before the offer. You see what would change on your site, on real prices, and then decide.

How accurate is it?

It replays your site on real day-ahead prices rather than averages. It shows what the plan would have done on those days, not a promise for every future day.

What if I have no EV fleet yet?

Our electrification configurator analyzes existing fleet data, including mobility data, to create electrification scenarios using currently available EVs, with the costs, savings and environmental benefits of a new EV fleet.

See what would change on your site

Book a 30 minute discovery call. We go through your fleet, chargers and connection.